Mounting and fit-out
Fixtures set into ceilings, coves, millwork and grounds — coordinated with the ceiling contractor so the details land where the drawing says.
Supplying a fixture is the easy half. We install on your premises, address the control system, aim every beam and hand over a scheme that works the way it was drawn.
Fixtures set into ceilings, coves, millwork and grounds — coordinated with the ceiling contractor so the details land where the drawing says.
Done after dark, on site, with the finishes in place. Beam angles and lens kits swapped where the room disagrees with the calculation.
Driver locations planned for access, labelled to the schedule, and installed where someone can actually reach them in five years.
Every device on the bus given an address, mapped to the drawings and named so the as-built schedule reads like the building.
Groups, scenes, fades, schedules and sensor behaviour set up with you in the room, then saved and backed up.
Every circuit exercised, every scene checked, snags cleared, and the documentation handed over as a package rather than a promise.
Lighting sits between the ceiling, the electrician and the finishes, and it is usually the last thing anybody scheduled. We plan around that rather than complaining about it.
Everything needed to run, change or repair the system without calling the person who installed it — though you can always call us.
We install and commission schemes we did not specify too — including sorting out DALI systems that were never properly addressed in the first place.